![]() |
|
||||||||||||||||||||||||||||||||
News: Impact fast response ensures GI Direct hit print deadline
17/07/2008 We received a desperate telephone call from GI Direct who really were in a mess. A large lorry had just demolished a section of the trim extraction system and therefore halted an important production run. Our Technical Services Division personnel reacted immediately, using there expertise to re-design the system and taking full advantage of our "in house" manufacturing facilities were on site within 2 hours. A temporary internal extraction system was assembled on site to allow production to continue. By the end of the day the full system was re-designed and fully assembled with the customer resuming full production within 6 hours of the incident. Our prompt action ensured losses were kept to a minimum and that important deadlines could still be met. Testimonial Due to a major incident that demolished part of our extraction system I was left unable to produce any products. I called Impact air systems hoping they could help re build my system. They responded with in the hour and took full control of the project .A replacement build was designed and built within six hours. I was back in production and making money. This is the sort of service that I would call world class and the sort of people I enjoy working with. Their knowledge and world class service is a refreshing change. Robin Carruthers Manufacturing Director GI Direct |
|
| clever thinking : clear results | ||
English Russian | ||